Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

August 2, 2026

January 1, 2035

Elizabeth St & Elm St

Demolition, New Construction, Renovation, Site Work

No Information to Display

$100,000,000.00

Public - State/Provincial

img_map_placeholder

Elizabeth St & Elm St, Toronto, ON

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Expansion of the Toronto SickKids Hospital. The scope of phase Two includes demolition of the Black and Hill wings, part of the original hospital building fronting onto University Avenue. The Burton Wing of the hospital will be renovated prior to demolition to provide addition decanting space. This phase also includes an addition to the Burton Wing to increase the number of beds to 430, including an approximately 120 bed Neonatal Intensive Care Unit, and critical care beds in single rooms to provide improved infection prevention. A new blood and marrow transplant unit with specialized ventilation system; Approximately 19 new operating suites, adaptable space for new technologies and procedures. A new Emergency Department featuring 51 treatment spaces. The lower three floors of the building are recessed to provide a generous 7-meter sidewalk at ground level which features landscaping and public realm improvements. The bulk of the tower will be built out to the property line, projecting over the expanded sidewalk, with a mechanical penthouse and green roof. TIMELINE: The project has secured Provincial Ministry of Health approval for Stage One for construction of a new Patient Support Centre (PCC) tower which is followed separately. The project will be procured through a Design-Build-Finance Maintain Model. The architect has completed the Stage Two functional planning approval applications for submission to the Ministry of Health. Stage three, schematic and detailed design are underway. A call for Planning-Design Compliance Consultants and Procurement for working drawings and construction is expected in early 2026. Working drawings are expected spring 2026. The tender for construction managers for Early Works has been issued and is followed separately. Demolition of the Black and Hill Wings is expected to proceed in 2026 with renovation and expansion of the Burton Wing to follow. Construction schedules for the new hospital are expected to be finalized based on completion of the renovation to the existing buildings. A private donation has been given to this project. Construction schedules are undetermined for phase two pending construction of phase one and Ministry approvals and funding potentially 2030.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects