Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 12, 2023

February 21, 2023

June 28, 2024

State Rte 2008

Demolition, New Construction, Paving, Site Work

No Information to Display

$2,122,456.00

Public - State/Provincial

img_map_placeholder

State Rte 2008, Honesdale, PA

Subscribe to View Full Documents

For the improvement of a certain section of STATE ROUTE 2008, Sec 670 in Wayne COUNTY, Honesdale Borough. The location of the project is as follows: From a point approximately 1 mile North from the intersection with SR 0006 (US Route 6) along SR 1001 to the intersection with Louie Drive at Segment 7010 Offset 0000 (STA 10+00) to (SR 2008 - Seg 0012 Off 0000 to Seg 0012 Off 0066, Carley Brook Bridge) to Segment 7014 Offset 0368 (STA 18+36), with a total work area length of 726 feet (0.138 miles). The project consists of the replacement of an existing state-owned structure, SR 2008, located on the municipal road Louie Drive, carrying traffic over Carley Brook with roadway improvements to the shoulders and the installation of guide rail. The existing single-lane 29' long encased I-beam structure will be replaced with a spread box beam structure on integral abutments. The proposed structure and approach roadway will adhere to PennDOT Publication 13M, Design Manual Part 2, Table 1.7, which will be comprised of two (2) - 9'-0" to 11'-0" travel lanes and 2'-0" to 4'-0" shoulders. The proposed horizontal alignment will mostly match the existing condition which meets a 25 MPH design speed for a posted speed limit of 25 MPH. The approach horizontal curve will need to be modified to accommodate the new approach slab for the replacement structure. The vertical geometry will be realigned to meet current design criteria. Other work includes excavation, full depth bituminous paving bridge approach, E & S control measures, temporary traffic signal, temporary bridge/ run-around road, permanent signing, pavement markings, landscaping and other miscellaneous construction work. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 51.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: BRIDGE REPLACEMENT 408 Version: 2020-5 PennDOT - PA 173 and Yankee School Rd Intersection *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects