Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 5, 2018

January 1, 2019

October 1, 2022

I-40

Demolition, New Construction, Paving, Site Work

No Information to Display

$360,175,000.00

Public - State/Provincial

img_map_placeholder

I-40, Raleigh, NC

Subscribe to View Full Documents

WBS Element No. 42346.3.1 Federal-Aid No. IMNHF-040-4(139)301 Counties: Wake and Johnston Route No. I-40 Miles: 12.8 Location: I-40 from I-440 / US 64 (Exit 301) to just north of SR 1525 (Cornwallis Road), including improvements to NC 42 and SR 1010 (Cleveland Road) The North Carolina Department of Transportation (NCDOT) is requesting interested Design-Build Teams submit qualifications for a Design-Build Project. The project, TIP I-5111 / I-4739, will widen I-40 from the I-40 / I-440 / US 64 interchange in Wake County to just north of SR 1525 (Cornwallis Road) in Johnston County, a distance of approximately 12.8 miles. The project will also modify interchanges and replace bridges along I-40. Interested parties should send a request, by e-mail only, to rfq_package_request@ncdot.gov for a formal package detailing the requirements for submitting a Statement of Qualifications. Technical questions related to the RFQ package, or other project related questions, should be sent via e-mail to designbuild@ncdot.gov. For tracking purposes, questions will only be answered through e-mail requests. Statement of Qualifications due from Design-Build Teams January 17, 2018 Department Announces Short-listed Teams February 6, 2018 Department Issues Industry Draft RFP to Short-listed Teams February 6, 2018 First Meeting with Short-listed Teams February 20, 2018 Department Issues Second Industry Draft RFP to Short-listed Teams March 6, 2018 Department Holds Statement of Qualifications Debriefs Week of March 11, 2018 Second Meeting with Short-listed Teams March 20, 2018 Department Issues Final RFP to Short-listed Teams April 3, 2018 Technical Proposals and Sealed Price Proposals Due May 30, 2018 Technical Presentations by Short-listed Teams June 14, 2018 Open Price Proposals June 19, 2018 Department Holds Technical Proposal Debriefs (Pending Contract Execution) Week of July 16, 2018 NCDOT - I-40 from I-440 / US 64 (Exit 301)

41 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.