Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

November 27, 2023

No Information to Display

Vandalia Rd

Outdoor Lighting, Site Work

No Information to Display

$350,000.00

Public - City

img_map_placeholder

Vandalia Rd, Des Moines, IA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Improvements are planned along Vandalia Road between the new SE Connector and Highway 65 to address safety concerns. These improvements address issues with signage, lighting, and drainage. Signage improvements have been be addressed over the past year. The segment from the SE Connector past the WRA entrance was reconstructed with new lighting as part of a WRA sewer project. Drainage improvements include storm sewer in ditching along Vandalia Road Lighting improvements along the corridor will be coordinated with the proposed drainage improvements. Project is included City of Des Moines FY 2021-2026 CIP Page 235 _______________________________________________________________________________________________________________________ Improvements are planned along Vandalia Road between the new SE Connector and Highway 65 to address safety concerns. These improvements address issues with signage, lighting, and drainage. Signage improvements have been be addressed over the past year. The segment from the SE Connector past the WRA entrance was reconstructed with new lighting as part of a WRA sewer project. Drainage improvements include storm sewer in ditching along Vandalia Road Lighting improvements along the corridor will be coordinated with the proposed drainage improvements. Project is included City of Des Moines FY 2021-2026 CIP Page 235 _______________________________________________________________________________________________________________________ Improvements are planned along Vandalia Road between the new SE Connector and Highway 65 to address safety concerns. These improvements address issues with signage, lighting, and drainage. Signage improvements will be addressed over the next year. The segment from the SE Connector past the WRA entrance will be reconstructed with new lighting as part of a WRA sewer project. Drainage improvements include storm sewer in ditching along Vandalia Road and will be constructed over the next few years. Lighting improvements along the corridor will be coordinated with the proposed drainage improvements. As of September 13, 2018, this project is included in the Fiscal Year 2018-2023 CIP. Design work is currently underway. Information regarding the design team and contractor selection has not been disclosed. A firm timeline has not been established; however, construction is planned to begin in the first quarter of 2018 and be complete by mid-2021.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of August 22, 2023, no new information available

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects