Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 10, 2023

November 6, 2023

October 18, 2024

PA-885

Paving, Site Work

No Information to Display

$4,477,777.00

Public - State/Provincial

img_map_placeholder

PA-885, Pittsburgh, PA

Subscribe to View Full Documents

Preservation Work on the Glenwood Bridge Including Guide Rail/end Transition Updates, Spall Repairs, Sidewalk Repairs, Repair/replacement of Expansion Dams, Drainage Repairs, Resetting/repair of Bearings, Rust Removal/repainting, Steel Repairs, Cleaning/sealing of Concrete, and Scour and Erosion Remediation and Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package for State Route 885, Section A53, in Allegheny County, City of Pittsburgh, Commonwealth of Pennsylvania. This Project Being Situated as Follows: From a Point Approximately 165 Feet East of the Intersection With Alluvian Street at Segment 0240/0241 Offset 0467 (Station 14+79) to a Point Approximately 485 Feet North of the Sr 837/sr 885 Interchange at Segment 0230 Offset 0706 (Station 43+13) and at Segment 0231 Offset 0488 (Station 43+13). Project Cost Range: $2,500,000.00 - $4,999,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 66.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes Prequalified Subs as Prime: No State Type of Work: Bridge Over Active Rr Tracks Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - MA08 - Glenwood Bridge *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. SR/SEC/ Group ID: 885/LOC/---

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.