Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 26, 2023

November 27, 2023

No Information to Display

100 Lincoln Centre Dr

Renovation, Site Work

No Information to Display

$5,200,000.00

Public - City

img_map_placeholder

100 Lincoln Centre Dr, Foster City, CA

Subscribe to View Full Documents

Project Description: The work to be performed under these specifications and drawings consists of coating, corrosion repair, and appurtenance improvements at each of the three (3) welded steel, four (4) million gallon water storage Tanks 1, 2, and 3, with minor improvements associated with Tank 4, an existing eight (8) million gallon concrete tank. Bidders must submit Document 00 4313 (Bond Accompanying Bid) accompanied by a cashier's check, certified check (certified without qualification and drawn on a solvent bank of the State of California or a National Bank doing business in the State of California) or completed form of Document 00 4313 of not less than 10% of the Total Bid Price based on terms contained in Document. Liquidated Damage Amounts : As liquidated damages for delay Contractor shall pay Owner two thousand dollars ($2,000.00) for each Day that expires after the time specified herein for Contractor to achieve Substantial Completion of the entire Work, until achieved. Completion of Work: All work shall be completed within 400 calendar days for the date when the Contract Time commences to run. Project Contact: Project Engineer Ryan Marquez, whose email address is rmarquez@fostercity.org. The Engineer's Opinion of Probable Costs is approximately $4,800,000 to $5,200,000. Owner specifically reserves the right, in its sole discretion, to reject any or all Bids, to re-bid, or to waive inconsequential defects in bidding not involving time, price or quality of the work. Owner may reject any and all Bids and waive any minor irregularities in the Bids.

27 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.