Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

August 31, 2023

No Information to Display

FL-45

Paving, Site Work

No Information to Display

$50,000,000.00

Public - State/Provincial

img_map_placeholder

FL-45, Tampa, FL

Our team is requesting plans for this project.

Subscribe to View Full Documents

Construction of a new bridge. As of August 21, 2023, a firm has been selected for Project Development and Environmental (PD&E) services. Information regarding design team and contractor selection has not been disclosed. A firm timeline has not been established; however, funding for right-of-way acquisition is budget in 2020 through 2022. Construction is not planned with in the five-year STIP planning period and is not expected to begin prior to 2023 at the earliest. *The following has been preserved for historical reference: Contract : 18737 Major Project (Department approved overhead audit required for major projects $500,000 or more) Selection Method : Letter of Response and Oral Presentation Financial Management Number(s): 44074912201 44074913201 Project Description: SWAT - Statewide Accelerated Transformation TBD Project Development and Environmental (PD&E) and Design TBD Advertisement Date : 02OCT2017 Longlist(Tech. Rev. Cmte.) Date: 02NOV2017 Time: 01:30PM Shortlist Selection Date : 14NOV2017 Time: 01:30PM Scope Meeting Date : 05DEC2017 Time: 08:30AM Tech. Rev. Cmte Meeting Date : 23JAN2018 Time: 01:00PM Final Selection Meeting Date : 13FEB2018 Time: 01:30PM 1st Date Negotiations Meetings : 01MAR2018 Time: 09:00AM The method of contractor selection has not been determined at this time. FDOT - Statewide Accelerated Transformation TBD Project Development and Environmental (PD&E) and Design TBD

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.