Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 11, 2017

February 5, 2024

No Information to Display

1 Plant Rd

New Construction, Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

1 Plant Rd, Chalk River, ON

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Construction Services for the Near Surface Disposal Facility. Construction services includes: Engineered Containment Mound (ECM) to encapsulate the disposed wastes. The ECM will be built in two phases with the current phase (Phase 1) enabling an initial waste capacity of 525,000 cubic metres (m3); Waste Water Treatment Plant (WWTP) to receive and process contact water and leachate and discharge effluent to the environment that fully satisfies codes and standards. Support Facilities including a vehicle decontamination facility, office, operations support centre, security kiosk, and weigh scales; and, Site Infrastructure that comprises, for example, fencing, roads, utility tie-ins and services. TIMELINE: Project has been awarded to Wood PLC, Maple Reinders is the subcontractor. Awarded trades were not released for publication. The construction of the near surface disposal facility will not commence until the CNSC has granted a license to construct. Prior to any licensing decision, a CNSC Commission hearing must be held. A public hearing is scheduled for August 10, 2023. Application submitted to amend the site license to authorize the construction. The August 10 oral hearing is to allow the Commission to hear oral final submissions from Indigineous Nations & communitites that made oral interventions during Part 2 of the public hearing, and from CML. Updates may be available late 2024.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details