Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

March 3, 2025

No Information to Display

957 Lee Rd

Addition, Renovation, Site Work

No Information to Display

$62,300,000.00

Public - County

img_map_placeholder

957 Lee Rd, Parksville, BC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Stage 4 expansion and odour control upgrades to the French Creek Pollution Control Centre. The expansion and upgrade to the existing wastewater treatment plant will increase plant capacity by about 30%, meet the service area demands to 2035, improve operational efficiency and replace aging infrastructure in the existing plant, and incorporate extensive odour control upgrades for the existing plant as well as odour controls for the expansion site. Solar panels will be added to the roof of the new expansion process building. TIMELINE: Project planning is ongoing. Results of a value engineering study exercise was presented to the board for further discussion. Tender schedule is unknown at this time. Further update in late summer, 2024. *Budget includes design and construction costs. The owner has partnered with Vancouver Island University Applied Environmental Research Laboratories to implement an air quality monitoring program to fingerprint the facility's current odour emissions.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.