Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

October 17, 2025

No Information to Display

4901 46 Ave

Addition, New Construction, Renovation, Site Work

No Information to Display

$20,000,000.00

Public - State/Provincial

img_map_placeholder

4901 46 Ave, Camrose, AB

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Plans may result in construction of a new student residences through a P3 Strategy. The University has a need for a new residence structure or structures to replace all or a portion of the current residence infrastructure, with the capacity to house between 500 and 600 undergraduate students, including first-year and upper-year undergraduates, on land owned by the University, or within close proximity to the Augustana campus. The University's requirement is that the proposed residence(s) are fully furnished, and contain community, amenity and study space characteristic of modern student resident facilities, including facilities appropriate for the provision of a mandatory meal plan for all student residents and, potentially, optional meal plan services for non-resident students. There is an opportunity for proponents to include space within the facilities that could be utilized not only by student residents, but by the entire Augustana Campus community, including, potentially, fitness facilities and commercial opportunities appropriate to a campus setting. TIMELINE: A Request for Information (RFI) was issued by the owner in early 2020, seeking information on the viability of such a project through a P3 strategy. Respondents were invited to submit information for the provision of providing solutions involving a range of risk transfer, up to and including design, construction, financing, ownership, maintenance, occupancy and operations. Project is currently not included in the owner's 2021-2024 capital plans. It's unknown whether the project will proceed in the near future. Further update may be available in 2024, pending owner's final plans. *Budget is undefined.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.