Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

July 15, 2025

No Information to Display

Multiple Locations

New Construction, Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Multiple Locations, Montreal, QC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Construction works for extension of subway line two ("orange") in Laval and Montreal. The scope of the project includes construction of an approximately 10.1 km tunnel with five stations on the territory of Saint-Laurent. The stations will be located at the Technoparc, near the A-40, as well as at the Bois-Franc, Le Ruisseau and Montpellier stations of the future Metropolitan Express Network (REM). In the future the line may be extended to Pierre-Elliott-Trudeau international airport. TIMELINE: Project is preliminary and in a conceptual development phase. The Quebec Government continues working on the orange subway line extension project and opened, in summer 2022, a project office for work scope finalization. Preliminary studies relating to the determination of the best solution to implement in a fifteen-kilometre corridor that will connect the Côte-Vertu subway station in Montreal to Dagenais Boulevard in the axis of Chomedey Boulevard are underway. The opportunity file report submission to the owner is anticipated in late 2023. Scope of work, timelines of the project development and its budget are being finalized. Note. Previous project of a light-rail line construction (REM) in that direction was abandoned by the owner.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects