Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 25, 2023

September 20, 2023

May 19, 2026

701 Warden Ave.

Demolition, New Construction, Renovation

No Information to Display

$627,000,000.00

Public - City

img_map_placeholder

701 Warden Ave., Toronto, ON

Subscribe to View Full Documents

This project is being bid by invitation only for PREQUALIFIED firms; list is INCOMPLETE. If you have been contacted by the owner to bid on this project as a prime contractor, and would like to be listed below, please notify our editorial staff at research.canada@constructconnect.com Construction services for the Warden Station Redevelopment Project as follows: - New street-level bus terminal building, site, and dedicated driveway with new above ground bus terminal concourse level for access to the existing subway station Concourse Level. - Two (2) new escalators and two (2) new elevators (Elevators E3 and E4) for access between the street level and concourse level of the new bus terminal. - New retail spaces, new service rooms, back-of-house rooms, and staff washrooms. - Temporary bus platform and shelters. - Temporary bus stops and shelters on Warden Avenue. - Demolition/Removal of existing and construction of new Passenger Pick-Up and Drop-Off (PPUDO) with short-term public parking spaces. - Demolition/Removal of existing and construction of new TTC South Commuter Parking Lot. - Modifications to existing right lane, boulevard, and sidewalk along Warden Avenue. - Modifications to existing bus terminal and PPUDO driveway entry ramps on St. Clair Avenue East. - New retaining wall for the aboveground subway track-level embankment along the new - PPUDO area and TTC South Commuter Parking Lot. - Upgrades to the electrical distribution and other site improvements and upgrades. *As of August 17 2023, the submissions are still under review with the owner.

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.