Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

No Information to Display

No Information to Display

50 Old River Rd.

No Information to Display

No Information to Display

$494,000.00

Public - City

img_map_placeholder

50 Old River Rd., Canton, CT

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The work for the Water Pollution Control Authority, Water Pollution Control Facility – UV System Upgrade project consists of the following: 1. Demolish all mechanical and electrical components of the existing ultraviolet (UV) disinfection system including supporting hardware and davit crane. Electrical system demolition shall include removal and disposal of existing distribution system components to the extent necessary to support the installation of the new UV disinfection system. 2. Provide two (2) banks of UV disinfection systems and ancillary equipment, including but not limited to power distribution centers, system control center, cleaning system hydraulics, automatic level controller, water level sensor, UV transmittance sensor and controller, and davit crane lift system. The UV Disinfection System shall be furnished by the Contractor under an owner-negotiated bid allowance. 3. Provide electrical and instrumentation components to support the installation of the new UV disinfection systems, including but not limited to, transformers, distribution panels, breakers, disconnects, conduit, and wiring. 4. Provide terminations for all instrumentation and electrical systems, and coordinate system SCADA integration to be completed by the Engineer. 5. Provide start-up coordination, to include Owner training and all provisions of the Manufacturer warranty, with the Owner, Engineer, Electrical Contractor and Manufacturer.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details