Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

No Information to Display

No Information to Display

Spring St.

No Information to Display

No Information to Display

$48,000.00

Public - City

img_map_placeholder

Spring St., Paoli, PA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

SUMMARY A. Section Includes: General description of Project and location. 1.02 SITE LOCATION A. Project location is along Spring Street and south of West Lancaster Avenue in Tredyffrin Township, Chester County, Pennsylvania. B. Exact location of Project is as indicated on "Location Map" on first sheet of Drawings. 1.03 WORK COVERED BY CONTRACT DOCUMENTS A. Without intending to limit or restrict extent of work required under this Contract, Work to be performed comprises the following: 1. Replacement of approximately 379 linear feet of 36-inch diameter storm sewer within Spring Street. 2. Provide without additional compensation, any apparatus, material and labor not specifically mentioned in specifications or indicated on Drawings, that is necessary to complete or perfect any portion of work in a substantial manner and in compliance with requirements implied or intended in these Contract Documents. This includes materials, devices or methods peculiar to the apparatus or system provided. 1.04 DRAWINGS A. Project Drawings: The Drawings listed on Sheet No. 1of the set of Drawings accompanying this Project Manual are hereby made a part of the Contract. The Work relative to each Contract is indicated on each Sheet in the set of Drawings. 1.05 SCHEDULING OPERATIONS A. Existing Facilities: The site of the work is an existing stormwater conveyance system and, when it is removed from service by work of this Project, may require the Contractor to provide a fail-safe (and properly sized) temporary means of continued stormwater flow. 1.06 MODIFICATIONS A. Owner and Engineer reserve right to make changes in order and execution of Work done under Contract as, in judgment of Engineer, may be necessary or expedient to Spring Street Storm Sewer Replacement 01110-1 Summary of Work

57 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.